Total Area 990 SQM
Service Delivered Office Fit-Out
Location High Street South Corporate Plaza, BGC Taguig City
Category Corporate

Setting the Standard for Site Management and Construction Discipline

MCFC was engaged to deliver the office fitout project for Carascal Nickel Corporation, covering a combined total of approximately 2,100 square meters at High Street South Corporate Plaza Tower 2. The project was particularly notable for MCFC’s collaboration with renowned Philippine architect Ed Calma, whose design vision required careful execution and attention to detail throughout construction.

Beyond project execution itself, the CNC project became recognized for MCFC’s exceptional site management practices. Due to the cleanliness, organization, and overall discipline maintained throughout construction, the building administration of High Street South Corporate Tower identified the MCFC site as the building’s model construction site.

At MCFC, site cleanliness is treated as a critical part of project execution rather than an afterthought. Dedicated cleaning personnel were assigned daily to maintain order throughout the active construction period, ensuring work areas remained clean, safe, and organized even during peak site activities. Staging areas were carefully managed to maintain efficiency, and daily hauling procedures were implemented to continuously free up workspace and improve overall site productivity.

This disciplined approach reflects MCFC’s maturity and professionalism within the office fitout industry. By maintaining organized and well-managed construction environments, the team is able to improve coordination, enhance safety, increase efficiency, and uphold professional standards expected within premium office developments.

The CNC project highlights MCFC’s commitment not only to construction quality, but also to operational discipline, professionalism, and responsible site management throughout every phase of execution.

Project Highlights

  • Client: Carascal Nickel Corporation

  • Project Size: 2,100 sqm (combined total)

  • Location: High Street South Corporate Plaza Tower 2

  • Designer: Ed Calma

  • Recognition: Selected by Building Administration as Model Construction Site

  • MCFC Site Management Standards:

    • Daily site cleaning during active construction

    • Organized staging and material management

    • Daily hauling to maximize workspace efficiency

  • Key Strength Demonstrated:

    • Construction discipline and professionalism

    • Strong operational organization

    • Commitment to safe and orderly project execution